Sieg-Huao, focuses on die casting and investment casting, provides metal works solution, high pressure die casting, precise machining and metal fabrication. 

Contact Us

Tel: +86-2584664117
E-mail: admin@mysieg.cn
Name: Sieg-Huao Gussworks(Nanjing) Company Limited.
Add: Room 201-202, the 4th Building, No.302 Central Road, Creative Central Industrial Park, Xuan Wu District, Nanjing City, Jiangu Province, China
 

Product

The articles shown below are all about the Product, through these related articles, you can get relevant information, notes in use, or latest trends about the Product. We hope these news will give you the help you need. And if these Product articles can't solve your needs, you can contact us for relevant information.
  • 10-09
    2020
    What is Die Retention Time And What Effects Does It Have?
    Mold retention time: the time from the end of the hold-down stage to the release of the die casting. The purpose of this time is to ensure that the casting is fully solidified, cooled and has a certain strength in the die, so that the die casting will not be deformed or cracked during the release an Read More »
  • 06-29
    2020
    What Is Holding Time?What Are The Main Factors That Affect It?
    After the metal liquid fills the cavity, the time required under the action of pressurization and specific pressure until the internal gate is completely set is called holding time.The effect of holding time is to crystallize the solidifying liquid metal under pressure, thus obtaining a die casting Read More »
  • 05-25
    2020
    There Are Four States of Liquid Metal Flow
    There are four flow modes when the metal liquid fills the mold cavity: jet flow, pressure flow, re-jet flow, and supplementary metal flow.Injection flow: In the initial stage of die casting, the molten metal passes through the inner sprue at a high speed, driven by the injection punch, and is shot s Read More »
  • 04-20
    2020
    What Is Die Retention Time And What Effects Does It Have?
    Mold retention time: the time from the end of the hold-down stage to the release of the die casting. The purpose of this time is to ensure that the casting is fully solidified, cooled and has a certain strength in the die, so that the die casting will not be deformed or cracked during the release an Read More »
Fax: +86-25-84664044
E-mail: admin@mysieg.cn
Add: Room 201-202, the 4th Building, No.302 Central Road, Creative Central Industrial Park, Xuan Wu District, Nanjing City,Jiangsu Province, China.
Phone1: +86-25-84664117
Phone2: +86-13505167212

About Us

Main Site locating in Nanjing of China.  We start our business since 2005, merge and sharehold serveral companies to enlarge and complete our manufacturing process to give our worldwide customers the comprehensive solution. 

Quick Links

Product

SEND US A MESSAGE
Copyright 2020 @ Sieg-Huao Gussworks(Nanjing) Company Limited .  All Rights Reserved.备案号:苏ICP备17048254号